|
EUROBURO LTD
-
|
|
|
Ref - HS
We are pleased to offer this
development of villas
• Parking space adjacent CONSTRUCTION • Foundation floor Steel reinforced concrete • Outside walls • Floors Plaster coloured on upgraded insulation 14 cm • Dividing walls between apartments 25 cm sound insulation wall with Senftenbach bricks 1,5 cm plaster • Inside walls Concrete blocks • Stairs Steel reinforced concrete steps • Ceilings Steel reinforced concrete ceilings • Roof covering: Timber Provision with steel plate • Balconies/Terraces Reinforced concrete floor • Windows Synthetic material, outside grey (aluminium) • Entrance doors Entrance door to the house: Synthetic door in white with cylinder lock Villas entrance doors: veneered wooden door with cylinder lock INTERNAL EQUIPMENT: • Inside doors Smooth doors in beech veneer, door furniture chrome coated brass • Tiles Tiles for walls and floors (standard yet to be fixed) WC: tiled floor to ceiling Bathroom: tiled floor to ceiling (max. 2.50 metres high) • Floors Cellar: Concrete floor pavement balconies: wood stairs and corridors: concrete apartments: entrance hall: tiles Kitchen: tiles Bath and WC: tiles living room, bed rooms: beech parquet floor • Painting All walls and ceilings will be painted white TECHNICAL EQUIPMENT: • WC Toilet: WC with toilet tank in white toilet paper holder: chromed Washbasin: Equipped with single mixer tap – white towel rail: chromed • Bathroom Shower: acrylic shower Toilet: WC with toilet tank in white Washbasin: white - equipped with single mixer tap, 2 Chromed towel rail 1 Mirror taps: all taps in the bathrooms are of brass with chrome coating washing machine: It is intended to have a washing machine and tumble drier for general use in the laundry room on the ground floor. • Kitchen Electrical connections: connection for electric cooker and refrigerator will be provided. There will also be a connection for a cooker hood, which is to be provided by the purchaser • Hot water Hot water will be provided through the house central hot water system • Heating system Heat from a district heating network under-floor heating • Establishing quantities used There will be meters to measure the amount of hot and cold water used by each apartment. There will also be meters to measure the amount of energy used to heat each apartment. • Electrical Installations Distribution box: according to the electrical installation plan, with complete meters and distribution box (cable laid in cellar on surface) switch gear: all switches will be flat type sockets: before building starts (in detail) be sure you know the amount and positions of all sockets required light fittings: of course there will be outlets for light fittings in every room (light fittings not included). • Outside The paths to the parking area and the dustbins are asphalt
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
U.K. Registered office
|